First RC results · Minas Gerais, Brazil · 8 September 2026

Rare earths from surface. New evidence at depth.

Magnes Rare Earths is advancing Minas Americas in Brazil. The latest assays add 139 auger holes and the first seven reported RC holes, including 29 m from 31 m at 0.58% TREO.

443 reported holes 3,628.8 assayed metres

Exploration stage · Head-grade drilled intervals · True thickness, recovery, mineral resources and economics have not been established

Latest drilling evidence

443 holes. Grade from surface and at depth. The next tests are clear.

The new package combines a full-hole auger benchmark, broad RC intervals to current depth limits and a quantified heavy rare-earth component. It also sharpens the work still required on continuity, recovery and economics.

01 · FROM SURFACE15 m

1.15% TREO

2,830 ppm MREO in MAV_AD_0375, from surface to EOH.

02 · AT DEPTH29 m

0.58% TREO

31 m to 60 m EOH, with 1,346 ppm MREO.

03 · HEAVY RARE EARTHS566 ppm

HREO over 5 m

Including 100 ppm DyTb in MAV_RC_0012.

04 · REPORTED SCALE443

reported holes

3,628.8 m of cumulative reported assay drilling.

05 · NEXT MILESTONES2026 · 2027

resource and PEA targets

Mineral-resource estimates before the end of 2026 and a PEA in H1 2027.

Exploration-stage project. These are selected head-grade drilled intervals, not recovery results, a mineral resource, reserve or economic assessment. MAV_RC_0012 includes a documented 30-31 m no-recovery interval, and no composite crosses the gap.

Evidence through 8 September 2026

337 days of evidence.

From the discovery announcement to 443 reported drill holes, the film follows the expanding assay record and the technical questions still to be answered.

Captioned film · Sound on for narration

Based on dated public disclosures · Information current through 8 September 2026.

Read transcript Technical disclosure
Aerial view of an industrial plant developed during Cristiano Veloso's prior operating tenure

Founder execution

Built from zero. Financed with discipline. Proven through cycles.

Magnes Founder & CEO Cristiano Veloso previously built and led the platform that became Verde from exploration through production and industrial scale.

Explore the founder track record
C$880M+
Two-cycle market-cap expansion
C$151M+
Gross capital accessed since inception
C$80.3M
Record FY2022 revenue
3.0 Mtpa
Reported installed production capacity

Historical Amazon Mining/Verde outcomes under Cristiano Veloso's leadership—not Magnes results. Market-cap expansion is illustrative, not realised investor returns; capital is a gross cumulative financing measure, not current liquidity.

Minas Americas project chronology

DRILLING UPDATE · 8 SEPTEMBER 2026

The updated chronology reconciles 297 previously reported holes with 146 additional holes and 1,299 assayed metres, taking the cumulative reported total to 443 holes and 3,628.8 metres.

Read the current result
Chronology reconciling 297 previously reported Minas Americas drill holes with 146 additional holes reported on 8 September 2026, for a cumulative total of 443 holes and 3,628.8 assayed metres.
Each mark represents a reported drill hole, not grade, volume or a resource.

Potential value inflection points

From more drilling to a first economic study.

Further drilling and assays feed the geological model. Modelling and representative metallurgy support the resource and PEA targets.

  1. 01 · NEXT CATALYSTTIMING NOT DISCLOSED

    Further drilling results

    Test repetition, drilled geometry, grade distribution and continuity across additional holes and target areas.

  2. 02 · TECHNICAL WORKACTIVE / PLANNED

    Model + representative metallurgy

    Build defensible geological domains while testing extraction, variability, selectivity and mass balance on representative material.

  3. 03 · CONDITIONAL TARGETBEFORE END-2026

    Maiden resource estimates

    Quantify tonnage, grade, geometry and classification under S-K 1300 and NI 43-101.

  4. 04 · CONDITIONAL TARGETH1 2027

    Preliminary economic assessment

    Bring resource, metallurgy, engineering and economic assumptions into a first development concept.

Management targets restated 8 September 2026: maiden resource estimates before end-2026 and a PEA in H1 2027, subject to results and the required technical work.

Investor resources

Start with the presentation, the latest result or a conversation.

The September 2026 presentation brings the investment case, drilling record, technical evidence, leadership, risks and forward catalysts into one institutional package.

Keep following

Follow the results that matter next.

Request Magnes updates or send investor relations a specific question.