Current October update · English technical context

Minas Gerais의 천부 자석용 희토류 발견지.

The combined assay compilation covers 879 holes and 7,468.8 assayed metres at the 25 September 2026 cutoff. It includes prior results and complete or partial assay coverage; it is not all-new drilling or gross physical drilling.

MAV_RC_0063 returned 30 metres from surface at 1,853 ppm MREO. Selected cumulative auger profiles include 8 metres at 2,194 ppm MREO in MAV_AD_0691 and 11 metres at 2,179 ppm MREO in MAV_AD_0639.

Reporting of the SGS bench-scale results is the next milestone, after results reconciliation and technical review. No numerical results from this programme are disclosed here. An optimised flowsheet and commercial recovery have not been established; timing and outcomes are not guaranteed.

Older translated project chapters are retained below as dated context, not as the October update. Updated technical translation is not asserted.

Dated translated context · issued-source chapter through 8 September 2026

Minas Americas · 브라질 Minas Gerais

지표부터 확인된 희토류. 심부의 새로운 증거.

Magnes Rare Earths는 브라질 Minas Americas 프로젝트를 추진하고 있습니다. 최신 분석에는 오거 시추공 139개와 최초 RC 시추공 7개가 추가됐으며, 심도 31m부터 29m 구간의 TREO 0.58% 결과가 포함됩니다.

보고된 시추공 443개 · 분석된 시추 길이 3,628.8m · 2026년 9월 8일

Dated translated context · issued-source chapter through 8 September 2026

왜 지금 Magnes인가

시추공 443개. 지표부터의 품위. 새로운 심부 증거.

추가 천부 및 심부 시추는 지질 모델링의 근거를 확대합니다. 연속성, 광물자원량 및 대표성 있는 야금 성능은 아직 검증이 필요합니다.

01 · 보고된 근거443

보고된 시추공

분석된 시추 길이: 3,628.8 m. 오거 시추공 139개와 최초 RC 시추공 7개, 분석된 시추 길이 1,299m가 추가됐습니다.

02 · 선정 결과15 m

지표부터

MAV_AD_0375: 지표부터 15m, TREO 1.15%, MREO 2,830ppm.

03 · 시추 결과 분포 범위>3.5 km²

보고된 분포 범위

보고된 지질도 작성 완료 지질 단위의 면적: >15 km².

04 · 다음 주요 일정2026 · 2027

광물자원량 및 PEA 목표

2026년 말 이전 광물자원량 추정치와 2027년 상반기 PEA.

05 · 투자 접근TSX:NPK

OTCQX:VNPKF

2026년 9월 8일 공시는 Magnes를 Verde AgriTech의 완전 자회사로 설명합니다. 별도로 거래되는 Magnes 증권은 공시되지 않았습니다.

탐사 단계 프로젝트입니다. 선정 시추 결과는 광물자원량, 매장량 또는 경제성 평가가 아닙니다. 연구 일정은 2026년 6월 16일 발표된 경영진의 목표를 반영하며, 결과와 필요한 기술 작업을 전제로 합니다.

재료에서 응용까지의 개념도로, 중간 처리 단계는 생략되어 있습니다. Magnes의 공정도나 설비 사진이 아닙니다.

재료에서 응용까지의 개념도로, 중간 처리 단계는 생략되어 있습니다. Magnes의 공정도나 설비 사진이 아닙니다.

Assay record through 25 September 2026

A growing record of evidence.

The combined compilation now covers 879 holes and 7,468.8 assayed metres. Follow the selected results and the next SGS bench-scale reporting milestone. Head grades are not recovered grades; the compilation includes prior results and partial assay coverage.

Apple Serena · British female AI narration · Captioned film

Current film, captions and transcript in English. Updated translations are pending review.

Information as of 4 October 2026 · Assay cutoff 25 September 2026 · Based on the approved release published 6 October 2026. Exploration-stage project; no resource, reserve or commercial recovery is established.

Read transcript Technical disclosure
Cristiano Veloso의 이전 운영 재임 기간에 개발된 산업시설의 항공 전경

창업자의 실행 역량

제로에서 구축하고, 절제 있게 조달하며, 여러 사이클을 거쳐 입증했습니다.

Magnes 창업자 겸 CEO Cristiano Veloso는 이전에 Verde로 성장한 플랫폼을 탐사 단계부터 생산과 산업 규모 운영까지 구축하고 이끌었습니다.

창업자의 실적 살펴보기
C$880M+
두 차례 사이클에 걸친 시가총액 확대
C$151M+
설립 이후 조달한 총자본
C$80.3M
FY2022 사상 최대 매출
3.0 Mtpa
보고된 설치 생산능력

Cristiano Veloso가 이끌었던 Amazon Mining/Verde의 과거 성과이며 Magnes의 실적이 아닙니다. 시가총액 확대는 예시일 뿐 실제 투자자 수익이 아닙니다. 자본은 누적 총조달액으로, 현재 유동성을 뜻하지 않습니다.

Minas Americas 프로젝트 연혁

최신 기술 업데이트 · 2026년 9월 8일 · 영문 도표

보고된 시추공 443개 · 분석된 시추 길이 3,628.8m. 오거 시추공 139개와 최초 RC 시추공 7개, 분석된 시추 길이 1,299m가 추가됐습니다.

최신 결과 보기(영문)
영문 도표 · Minas Americas · 2026년 9월 8일. 보고된 시추공 443개 · 분석된 시추 길이 3,628.8m. 오거 시추공 139개와 최초 RC 시추공 7개, 분석된 시추 길이 1,299m가 추가됐습니다. 탐사 단계입니다. 분석값은 원광 품위이며 구간은 시추 길이입니다. 실제 두께는 미확정이며, 광물자원량·회수율·프로젝트 경제성을 입증하지 않습니다.
Dated translated context · issued-source chapter through 8 September 2026

잠재적 가치 변곡점

추가 시추에서 최초 경제성 연구까지.

추가 시추와 분석 결과가 지질 모델의 기반이 됩니다. 모델링과 대표성 있는 야금 시험은 광물자원량 및 PEA 목표를 뒷받침합니다.

  1. 01 · 다음 카탈리스트일정 미공개

    추가 시추 결과

    추가 시추공과 목표 구역에서 반복성, 시추 형상, 품위 분포 및 연속성을 검증합니다.

  2. 02 · 기술 작업진행 중 / 계획됨

    모델 + 대표성 있는 야금 시험

    대표성 있는 물질을 대상으로 추출, 변동성, 선택성 및 물질수지를 시험하는 동시에 기술적으로 타당한 지질 도메인을 구축합니다.

  3. 03 · 조건부 목표2026년 말 이전

    최초 광물자원량 추정치

    S-K 1300 및 NI 43-101에 따라 톤수, 품위, 형상 및 분류를 정량화합니다.

  4. 04 · 조건부 목표2027년 상반기

    예비경제성평가

    광물자원량, 야금, 엔지니어링 및 경제성 가정을 최초 개발 개념에 통합합니다.

2026년 6월 16일 발표된 경영진 목표: 결과와 필요한 기술 작업을 전제로, 2026년 말 이전 최초 광물자원량 추정치 및 2027년 상반기 PEA.

투자자 자료

프레젠테이션, 최신 결과 또는 직접 대화부터 시작하십시오.

2026년 9월 프레젠테이션은 투자 논리, 시추 기록, 기술적 근거, 경영진, 위험 요인 및 향후 카탈리스트를 하나의 기관투자자용 자료로 통합합니다.

계속 지켜보기

다음으로 중요한 결과를 계속 확인하십시오.

Magnes 업데이트를 요청하거나 투자자 관계팀에 구체적인 질문을 보내십시오.