已报告钻孔
化验钻探米数: 3,628.8 m. 新增139个螺旋钻孔及首批7个RC钻孔,共1,299米化验钻探。
Current October update · English technical context
The combined assay compilation covers 879 holes and 7,468.8 assayed metres at the 25 September 2026 cutoff. It includes prior results and complete or partial assay coverage; it is not all-new drilling or gross physical drilling.
MAV_RC_0063 returned 30 metres from surface at 1,853 ppm MREO. Selected cumulative auger profiles include 8 metres at 2,194 ppm MREO in MAV_AD_0691 and 11 metres at 2,179 ppm MREO in MAV_AD_0639.
Reporting of the SGS bench-scale results is the next milestone, after results reconciliation and technical review. No numerical results from this programme are disclosed here. An optimised flowsheet and commercial recovery have not been established; timing and outcomes are not guaranteed.
Older translated project chapters are retained below as dated context, not as the October update. Updated technical translation is not asserted.
巴西米纳斯吉拉斯州(Minas Americas)
Magnes Rare Earths正在推进巴西Minas Americas项目。最新化验新增139个螺旋钻孔及首批7个反循环(RC)钻孔,包括从31米起29米、TREO品位0.58%的区间。
443个已报告钻孔 · 3,628.8米化验钻探 · 2026年9月8日
为何现在关注 Magnes
新增浅部及深部钻探数据,为地质建模提供更多证据。连续性、矿产资源及具代表性的冶金性能仍需验证。
化验钻探米数: 3,628.8 m. 新增139个螺旋钻孔及首批7个RC钻孔,共1,299米化验钻探。
MAV_AD_0375:自地表15米,TREO 1.15%,MREO 2,830 ppm。
位于一个已编图地质单元内,据报告面积为 >15 km².
2026 年底前完成矿产资源量估算,并于 2027 年上半年完成 PEA。
2026年9月8日的披露将Magnes描述为Verde AgriTech全资拥有;未披露单独交易的Magnes证券。
勘探阶段项目。精选钻探结果不构成矿产资源量、储量或经济评价。研究时间安排反映管理层于 2026 年 6 月 16 日公布的目标,仍取决于结果及所需技术工作。

从材料到应用的概念示意图,未展示中间加工步骤。这不是Magnes工艺流程图或设备照片。
Assay record through 25 September 2026
The combined compilation now covers 879 holes and 7,468.8 assayed metres. Follow the selected results and the next SGS bench-scale reporting milestone. Head grades are not recovered grades; the compilation includes prior results and partial assay coverage.
Apple Serena · British female AI narration · Captioned filmCurrent film, captions and transcript in English. Updated translations are pending review.

创始人执行力
Magnes 创始人兼首席执行官 Cristiano Veloso 此前从勘探阶段起建设并领导了后来发展为 Verde 的平台,直至投产和实现工业规模。
了解创始人履历这些是 Cristiano Veloso 领导下 Amazon Mining/Verde 的历史结果——并非 Magnes 结果。市值增长仅作示意,不代表投资者已实现回报;资本数值为累计融资总额,而非当前流动性。

潜在价值拐点
进一步钻探和化验为地质模型提供依据。建模和代表性冶金测试为资源量与 PEA 目标提供支持。
检验更多钻孔和目标区的重复性、钻探几何形态、品位分布和连续性。
在代表性物料上测试提取、变异性、选择性和质量平衡,同时构建可经受审查的地质矿化域。
依据 S-K 1300 和 NI 43-101 量化吨位、品位、几何形态与分类。
将资源量、冶金、工程和经济假设纳入首个开发概念。
2026 年 6 月 16 日公布的管理层目标:在 2026 年底前完成首次资源量估算,并于 2027 年上半年完成 PEA;具体取决于结果及所需技术工作。
投资者资源
2026 年 9 月演示文稿将投资逻辑、钻探记录、技术证据、领导团队、风险和前瞻催化剂整合为一套机构投资者资料。