15 m from surface to EOH
1.15% TREO
Selected head-grade drilled intervalMinas Gerais, Brazil · Exploration stage
A magnet-rich rare-earth system, with Nd, Pr, Dy and Tb at the centre of the project's strategic focus, now supported by 443 holes of reported assay drilling.
Magnes Rare Earths' 8 September 2026 results combine a 15 m full-hole result from surface at 1.15% TREO with the first reported RC intervals at depth, led by 29 m at 0.58% TREO to the bottom of a 60 m hole.
15 m from surface to EOH
1.15% TREO
Selected head-grade drilled interval3,628.8 m of reported assays
from surface to EOH
31 m to 60 m EOH
Including 100 ppm DyTb
Reported intervals are drilled lengths. True thickness remains to be determined. MAV_RC_0012 contains a documented 30-31 m no-recovery interval; no composite crosses it.
Project + regional context
See Minas Americas in Brazil alongside the published exploration points, principal roads and clearly labelled Verde regional reference locations.
The detailed map is loaded only when requested, keeping the first page view responsive on mobile connections.
Spatial disclosure record
The approved map below preserves the spatial disclosure record through 16 June 2026: 75 surface and trench samples at 61 mapped locations, followed by 3, 24, 17 and 253 drill holes.
The 8 September 2026 results are presented below without adding the new collar map, which remains subject to separate GIS and Qualified Person clearance.
Drilling results · 8 September 2026
MAV_RC_0012 returned 29 metres from 31 metres to the 60-metre EOH at 5,751 ppm TREO (0.58% TREO) and 1,346 ppm MREO. MAV_AD_0375 returned 15 metres from surface to EOH at 11,480 ppm TREO (1.15% TREO) and 2,830 ppm MREO.
Five of seven RC holes returned elevated intervals to their current depth limits. Comparable grades below EOH and continuity between holes remain untested.
Selected head-grade drilled intervals are not a mineral resource, reserve, recovery estimate or economic result. True thickness has not been determined. MAV_RC_0012 includes a documented 30-31 m no-recovery interval, and no composite crosses that gap. The separate Drill-Hole and Assay Results Annex referred to in the release is not included in this website package.
The visual below preserves the selected shallow intervals and 253-hole aggregate reported in the June update. It is retained as a dated part of the project record.

Table 1 of the 16 June 2026 release listed 12 selected new hole-level intervals, each beginning at surface, with drilled lengths from 6 to 14 metres. The rows remain ordered by TREO, not by spatial position.
| Hole | Drilled interval | TREO (ppm) | MREO (ppm) |
|---|---|---|---|
| MAV_AD_0200 | 0–10 m | 9,736 | 2,407 |
| MAV_AD_0288 | 0–10 m | 9,090 | 2,121 |
| MAV_AD_0299 | 0–8 m | 8,998 | 2,327 |
| MAV_AD_0138 | 0–6 m | 8,608 | 2,242 |
| MAV_AD_0287 | 0–6 m | 8,548 | 2,196 |
| MAV_AD_0237 | 0–14 m | 8,527 | 1,954 |
| MAV_AD_0205 | 0–11 m | 8,113 | 1,761 |
| MAV_AD_0097 | 0–8 m | 7,965 | 1,845 |
| MAV_AD_0077 | 0–12 m | 7,927 | 1,811 |
| MAV_AD_0320 | 0–6 m | 7,698 | 2,018 |
| MAV_AD_0201 | 0–12 m | 7,677 | 1,764 |
| MAV_AD_0236 | 0–8 m | 7,654 | 1,868 |
Across the 253-hole June dataset, the disclosed length-weighted averages were 3,640 ppm TREO and 800 ppm MREO. The 16 June 2026 release reported 94 hole-level composites at or above 4,000 ppm TREO over 826 metres, including 17 at or above 7,000 ppm TREO over 163 metres. All intervals shown are selected head-grade drilled lengths; true thickness has not been determined.
Selected results are head-grade drilled intervals. The release provides no mineral resource, recovery estimate, economics, production guidance or development decision. The later 8 September 2026 disclosure expands the reported drilling record.
Published section context
A schematic redraw of the published A–B section, showing four intervals reconciled to the assay tables.
MAV_AD_0012MAV_AD_0013MAV_AD_0002MAV_AD_0001Regional execution experience
Cristiano Veloso previously led a mineral business in Minas Gerais through exploration, permitting, financing, mine and plant construction, commissioning and production.
That historical record includes two mines, three plants—two mineral-fertilizer plants and one bioproduction facility—and infrastructure extending to roads, a new bridge and a high-voltage grid connection.
Explore the founder track recordHistorical Verde assets and works do not establish Magnes ownership, access, capital requirements, operating readiness or project economics.
Work programme
The 8 September 2026 news release restates management targets for mineral-resource estimates before year-end 2026 and a PEA in H1 2027, subject to results and completion of the required technical and regulatory work.
Map the distribution, drilled geometry and head grade through fieldwork and assays.
Integrate the drilling and supporting datasets without treating exploration footprints as resources.
Measure extraction, selectivity, variability and impurity behaviour with a complete mass balance.
Integrate drilling, geology, metallurgy, engineering and economics into formal studies.
Bring technical results, permits, financing and corporate approval into one capital decision.
Methods and QA/QC
Auger and RC samples were analysed by SGS Geosol Laboratorios S.A. using lithium-borate fusion followed by ICP-MS/OES determination. The QA/QC programme included blanks, certified reference materials, field duplicates and laboratory controls.
The scientific and technical information in the 8 September 2026 release was reviewed and approved by Carlos Leite, MAusIMM CP(Geo) (No. 1006695), an independent consultant to Magnes and a Qualified Person under NI 43-101.
Read the technical review in contextThe 8 September 2026 release names Carlos Leite, MAusIMM CP(Geo), as the independent Qualified Person responsible for its technical content.
Current stage
The next phase focuses on continuity, recovery, impurities and the route to a potential product.
Follow the project
See the milestones designed to test continuity, recovery and a preliminary development concept.