Read what was reported, why it matters and the limits of the result—then open the issued release for the complete record.
These pages summarise issued releases for easier reading. Use the attached PDF for the complete record, and check later releases for any update.
FEATURED UPDATECURRENT TECHNICAL BASIS · 8 SEPTEMBER 2026
Technical update
15 m at 1.15% TREO from surface and first RC results
MAV_AD_0375 returned 15 metres from surface to EOH at 11,480 ppm TREO (1.15% TREO) and 2,830 ppm MREO. MAV_RC_0012 returned 29 metres from 31 metres to the 60-metre EOH at 5,751 ppm TREO (0.58% TREO) and 1,346 ppm MREO.
From discovery announcement to the latest drilling.
Older releases remain available as dated records. Later technical disclosure may update earlier interpretations, targets or project statistics.
FILTER THE RECORD
Showing 9 records.
Drilling results
historical technical record
Magnes reports a selected 10 m interval from surface at approximately 0.97% TREO
The 16 June 2026 update brought the reported assay record to 297 drill holes. Selected interval MAV_AD_0200 returned 10 metres from surface at 9,736 ppm TREO (approximately 0.97%) and 2,407 ppm MREO.
The 20 May 2026 update established Magnes as a dedicated rare-earth company and outlined a conditional intention to pursue a future separate U.S. listing.
The greater-than-3.5 km² drill-result footprint is the distribution of drilling with reported mineralisation as at 17 March 2026. The same release distinguished this footprint from a broader mapped geological unit.
Surface and trench disclosure outlines an exploration zone
The 6 October 2025 disclosure described an exploration zone of approximately 5,500 hectares across 13 reported mineral rights, derived principally from surface work and integrated datasets.
Each page reflects what was reported on its date. Where later disclosure updates a number, interpretation or target, the newer record takes precedence.
Assays are head grades. Selected results do not represent the complete dataset. Reported intervals are drilled lengths; true thickness has not been determined. MREO is the analytical sum of Nd2O3 + Pr6O11 + Dy2O3 + Tb4O7, not a recovery or product specification. For the 8 September 2026 results, HREO and MREO overlap through Dy2O3 and Tb4O7 and are not additive.