rapporterte borehull
analyserte boremeter: 3,628.8 m. 139 skrueborhull og de første sju RC-borehullene tilføyer 1 299 analyserte boremeter.
Current October update · English technical context
The combined assay compilation covers 879 holes and 7,468.8 assayed metres at the 25 September 2026 cutoff. It includes prior results and complete or partial assay coverage; it is not all-new drilling or gross physical drilling.
MAV_RC_0063 returned 30 metres from surface at 1,853 ppm MREO. Selected cumulative auger profiles include 8 metres at 2,194 ppm MREO in MAV_AD_0691 and 11 metres at 2,179 ppm MREO in MAV_AD_0639.
Reporting of the SGS bench-scale results is the next milestone, after results reconciliation and technical review. No numerical results from this programme are disclosed here. An optimised flowsheet and commercial recovery have not been established; timing and outcomes are not guaranteed.
Older translated project chapters are retained below as dated context, not as the October update. Updated technical translation is not asserted.
Minas Americas · Minas Gerais, Brasil
Magnes Rare Earths videreutvikler Minas Americas-prosjektet i Brasil. De nyeste analysene tilføyer 139 skrueborhull og de første sju RC-borehullene, inkludert 29 m fra 31 m dybde med 0,58 % TREO.
443 rapporterte borehull · 3 628,8 analyserte boremeter · 8. september 2026
Hvorfor Magnes nå
Flere grunne og dypere boredata utvider grunnlaget for geologisk modellering. Kontinuitet, mineralressurser og representativ metallurgisk ytelse må fortsatt dokumenteres.
analyserte boremeter: 3,628.8 m. 139 skrueborhull og de første sju RC-borehullene tilføyer 1 299 analyserte boremeter.
MAV_AD_0375: 15 m fra overflaten med 1,15 % TREO og 2 830 ppm MREO.
Innenfor en kartlagt geologisk enhet med rapportert areal på >15 km².
Mineralressursestimater før utgangen av 2026 og en PEA i H1 2027.
Meldingen 8. september 2026 beskriver Magnes som heleid av Verde AgriTech. Det er ikke opplyst om et separat omsatt Magnes-verdipapir.
Prosjekt i letefasen. Utvalgte boreresultater er ikke en mineralressurs, mineralreserve eller økonomisk vurdering. Tidspunktene for studiene gjenspeiler ledelsens mål kunngjort 16. juni 2026 og er fortsatt avhengige av resultater og det nødvendige tekniske arbeidet.

Konseptillustrasjon fra materiale til anvendelse. Mellomliggende behandlingstrinn er ikke vist; dette er ikke et Magnes-flytskjema eller et utstyrsfotografi.
Assay record through 25 September 2026
The combined compilation now covers 879 holes and 7,468.8 assayed metres. Follow the selected results and the next SGS bench-scale reporting milestone. Head grades are not recovered grades; the compilation includes prior results and partial assay coverage.
Apple Serena · British female AI narration · Captioned filmCurrent film, captions and transcript in English. Updated translations are pending review.

Gründerens gjennomføringsevne
Magnes-gründer og administrerende direktør Cristiano Veloso bygget og ledet tidligere plattformen som ble til Verde, fra leting til produksjon og industriell skala.
Utforsk grunnleggerens dokumenterte historikkHistoriske resultater fra Amazon Mining/Verde under Cristiano Velosos ledelse — ikke resultater fra Magnes. Økningen i markedsverdi er illustrativ og er ikke realisert investoravkastning; kapital er et brutto kumulativt finansieringsmål, ikke nåværende likviditet.
443 rapporterte borehull · 3 628,8 analyserte boremeter. 139 skrueborhull og de første sju RC-borehullene tilføyer 1 299 analyserte boremeter.
Les nyeste resultater (engelsk)
Mulige verdimilepæler
Ytterligere boring og analyser tilfører data til den geologiske modellen. Modellering og representativ metallurgi understøtter målene for ressursestimat og PEA.
Teste om mineraliseringen gjentar seg, samt boredefinert geometri, gehaltfordeling og kontinuitet i flere borehull og målområder.
Bygge robuste geologiske domener samtidig som utvinning, variasjon, selektivitet og massebalanse testes på representativt materiale.
Kvantifisere tonnasje, gehalt, geometri og klassifisering i henhold til S-K 1300 og NI 43-101.
Samle ressursdata, metallurgi, ingeniørarbeid og økonomiske forutsetninger i et første utviklingskonsept.
Ledelsens mål kunngjort 16. juni 2026: første mineralressursestimater før utgangen av 2026 og en PEA i H1 2027, avhengig av resultatene og det nødvendige tekniske arbeidet.
Investorressurser
Presentasjonen fra september 2026 samler investeringscaset, boreresultatene, den tekniske dokumentasjonen, ledelsen, risikoene og kommende katalysatorer i én institusjonell pakke.
Følg
Be om oppdateringer fra Magnes eller send IR-teamet et konkret spørsmål.