Magnet rare-earth mining
China's share of 2024 global mined production
Strategic location · Execution context
Minas Americas combines a Minas Gerais location, a documented regional execution record and strategic relevance to more diversified magnet rare-earth supply chains.
Brazilian scale · Minas Gerais expertise · Regional execution
The strategic equation
Three reinforcing layers connect global demand to a specific Brazilian project.
China's reported share of 2024 sintered permanent-magnet production. Diversification requires new capacity across mining, refining and magnets.
Brazil's share of the global rare-earth reserve total in the federal 2026 investor guide.
Reported drill holes as at 8 September 2026, building the evidence for resource definition and metallurgy.
Can a well-located exploration project convert geological evidence into a technically credible, responsibly developed and commercially relevant source of magnet rare earths?
Follow the evidence gatesWhy Brazil
Brazil's 2026 federal investor guide reports a substantial national rare-earth reserve base alongside limited current output. In other words, the geological endowment is large, but it has not yet become proportionate supply.
That gap creates strategic relevance for Brazilian projects able to connect geology, recovery, product definition, permitting, financing and partnerships.
Open the 2026 federal investor guide2025 reserve and production figures reported in Brazil's 2026 federal investor guide.
Why diversification matters
A new discovery matters strategically only if it can connect into separation, product qualification and customer demand.
Resource definition, recovery and product partnerships form the bridge from discovery to a new potential source of magnet rare earths.
Explore strategic partnershipsWhy Minas Gerais · Why Magnes
Invest Minas describes Minas Gerais as Brazil's largest state ore producer and identifies an established mineral-industry, foundry and specialised research base.
Magnes' company-specific advantage is experience: before Magnes, Cristiano Veloso led a regional mineral business through exploration, permitting, financing, construction, commissioning and production.



A full-cycle company-building record in Minas Gerais, now applied to the exploration, technical de-risking and decisions ahead at Minas Americas.
Leadership and governanceIn October 2022, the prior listed operating company reported completing a 22 km Plant 2 road programme, including 14 km of asphalt and a new bridge, during Cristiano Veloso’s founder and CEO tenure. Verde also reported company-owned rigs and vehicles, field teams, laboratory capability and high-voltage power upgrades in its regional platform.
Historical prior-company outcomes—not Magnes assets, funding, operating readiness or project economics.From ground to disclosure
Field records, sample identity, laboratory analysis and Qualified Person review make every reported result traceable.
Field mapping, trenching and drilling create the physical project record.
Collars, intervals and sample identifiers preserve where each result came from.
The 8 September programme used SGS Geosol methods and stated QA/QC controls.
An independent Qualified Person reviewed the cited technical release.
The 8 September 2026 release states that auger and RC samples were submitted to SGS Geosol Laboratorios S.A. and analysed using lithium-borate fusion followed by ICP-MS/OES, with blanks, certified reference materials, field duplicates and laboratory controls used for QA/QC.
Read methods and QA/QCThe scientific and technical information in the 8 September 2026 release was reviewed and approved by Carlos Leite, MAusIMM CP(Geo) (No. 1006695), an independent consultant to Magnes and a Qualified Person under NI 43-101.
Read the latest result in contextWhat comes next
The setting is strong. The next phase must define the resource, prove recovery, establish a product route and test the economics.
Convert drilling, assays and geological interpretation into a compliant estimate of tonnage, grade and continuity.
Test representative material across variability, impurities, reagent demand and mass balance.
Define the separation interface, product specification and customer qualification path.
Integrate engineering, permitting, infrastructure, capital and operating assumptions.
Sources
Global supply, Brazil, Minas Gerais, project results and execution history—each linked to its source.
Global market context is not evidence for Minas Americas recoverability, products, economics, financing or government support.
Open source BRAZILBrazil critical-minerals investor guide 2026Does not establish Magnes eligibility, financing, title, permits, endorsement or government backing.
Open source MINAS GERAISMinas Gerais mining-sector profileState promotional context only. It is not evidence of Magnes or Minas Americas assets, project costs, permitting status, financing, government backing, processing capacity or a development outcome.
Open source PROJECT8 September 2026 first RC and auger resultsSelected head-grade drilled intervals are not a mineral resource, reserve, recovery estimate or economic result. True thickness has not been determined. MAV_RC_0012 includes a documented 30-31 m no-recovery interval, and no composite crosses that gap. The separate Drill-Hole and Assay Results Annex referred to in the release is not included in this website package.
Open source REGIONAL EXECUTION1 August 2026 founder recordBiographical framing only. Historical assets and investment belonged to the prior listed operating company and do not establish a development outcome for Minas Americas.
Open source REGIONAL PLATFORM2 December 2025 first drill assaysLater tables contain small reconciliation differences for some early composites; later disclosure controls.
Open source CAPACITY24 May 2023 historical investment and capacity disclosureThe investment and reported capacity relate to the prior listed operating company, not Magnes or Minas Americas. Reported capacity is not actual output.
Open source CAPITAL DISCIPLINE15 August 2026 capital auditGross cumulative financing flows are not net new growth capital, current liquidity, capital retained or Magnes funding.
Open source ROAD + BRIDGE19 October 2022 road and bridge disclosureHistorical prior-company works; not Magnes or Minas Americas assets or evidence of project costs, engineering, permitting, financing or a development outcome.
Open source COMMERCIAL PRODUCTION14 November 2018 commercial production declarationHistorical operating record of the prior listed company; not a Magnes or Minas Americas production claim.
Open sourceApproximate map marker: 19.52°S / 46.11°W.
From context to evidence
Review what Minas Americas has reported, what could change the thesis and what must still be proven.