News & Results / Drilling results
Drilling results

Drill-result footprint extends beyond 3.5 km²

The greater-than-3.5 km² drill-result footprint is the distribution of drilling with reported mineralisation as at 17 March 2026. The same release distinguished this footprint from a broader mapped geological unit.

historical technical record
KEY POINTS

What the release reported.

  • The greater-than-3.5 km² drill-result footprint is the distribution of drilling with reported mineralisation as at 17 March 2026.
  • The greater-than-15 km² mapped geological unit is a mapped and surface-sampled extent.
Open issued source PDF
ISSUED RECORD

The exact release and its place in the chronology.

Issuer
Verde AgriTech Ltd.
Issued headline
Verde Expands Minas Americas Magnet-Rich Ionic Clay Discovery Beyond 3.5 km²; MAV_AD_0028 Returns 10 m at 0.84% TREO
Record status
historical technical record

The 8 September 2026 release is the later controlling technical source in this archive and expands the reported assay record to 443 holes.

Drilling resultsAssaysExploration footprintGeological modelling
INVESTOR READ

What matters next.

Not a mineral-resource boundary, reserve, tonnage estimate or proof of continuous mineralisation. Not drill-confirmed throughout and not a mineral-resource boundary.

DEFINITIONS

Assays are head grades. Selected results do not represent the complete dataset. Reported intervals are drilled lengths; true thickness has not been determined. MREO is the analytical sum of Nd2O3 + Pr6O11 + Dy2O3 + Tb4O7, not a recovery or product specification. For the 8 September 2026 results, HREO and MREO overlap through Dy2O3 and Tb4O7 and are not additive.