Current October update · English technical context
결과, 맥락 및 출처를 함께 확인하세요.
The combined assay compilation covers 879 holes and 7,468.8 assayed metres at the 25 September 2026 cutoff. It includes prior results and complete or partial assay coverage; it is not all-new drilling or gross physical drilling.
MAV_RC_0063 returned 30 metres from surface at 1,853 ppm MREO. Selected cumulative auger profiles include 8 metres at 2,194 ppm MREO in MAV_AD_0691 and 11 metres at 2,179 ppm MREO in MAV_AD_0639.
Reporting of the SGS bench-scale results is the next milestone, after results reconciliation and technical review. No numerical results from this programme are disclosed here. An optimised flowsheet and commercial recovery have not been established; timing and outcomes are not guaranteed.
Older translated project chapters are retained below as dated context, not as the October update. Updated technical translation is not asserted.
분석에서 매출까지
암석에서 매출까지의 다섯 가지 지표.
희토류 발견과 인증 제품 매출 사이에는 서로 구분되는 다섯 가지 지표가 있습니다.
- 01
원광 품위
원시료 고체에 함유된 성분.
- 02
진단 용액
명시된 한 가지 시험에서 용해된 성분.
- 03
추출률
물질수지를 바탕으로 용액으로 이동한 비율.
- 04
공정 회수율
모든 공정 단계를 거쳐 정의된 제품에 도달한 비율.
- 05
판매 가능 회수율
사양 및 공제 후 고객이 대금을 지급할 부분.