Current October update · English technical context
ראו יחד את התוצאה, ההקשר והמקור.
The combined assay compilation covers 879 holes and 7,468.8 assayed metres at the 25 September 2026 cutoff. It includes prior results and complete or partial assay coverage; it is not all-new drilling or gross physical drilling.
MAV_RC_0063 returned 30 metres from surface at 1,853 ppm MREO. Selected cumulative auger profiles include 8 metres at 2,194 ppm MREO in MAV_AD_0691 and 11 metres at 2,179 ppm MREO in MAV_AD_0639.
Reporting of the SGS bench-scale results is the next milestone, after results reconciliation and technical review. No numerical results from this programme are disclosed here. An optimised flowsheet and commercial recovery have not been established; timing and outcomes are not guaranteed.
Older translated project chapters are retained below as dated context, not as the October update. Updated technical translation is not asserted.
מבדיקה להכנסה
חמישה מדדים מהסלע להכנסה.
חמישה מדדים נפרדים עומדים בין מציאת יסודות אדמה נדירים לבין הפקת הכנסה ממוצר שאושר.
- 01
תכולה בדגימה לפני עיבוד
מה מכילה הדגימה המוצקה המקורית.
- 02
פתרון אבחון
מה נמס בבדיקה מוגדרת אחת.
- 03
אחוז מיצוי
החלק שעבר לתמיסה, עם מאזן מסה.
- 04
השבה בתרשים הזרימה
החלק שמגיע למוצר מוגדר לאחר כל שלב בתהליך.
- 05
השבה בת‑תשלום
החלק שעבורו לקוח ישלם לאחר מפרטים וניכויים.