公表済み掘削孔
分析済み掘削メートル: 3,628.8 m. オーガー139孔と初のRC7孔、分析済み掘削長1,299 mを追加。
Current October update · English technical context
The combined assay compilation covers 879 holes and 7,468.8 assayed metres at the 25 September 2026 cutoff. It includes prior results and complete or partial assay coverage; it is not all-new drilling or gross physical drilling.
MAV_RC_0063 returned 30 metres from surface at 1,853 ppm MREO. Selected cumulative auger profiles include 8 metres at 2,194 ppm MREO in MAV_AD_0691 and 11 metres at 2,179 ppm MREO in MAV_AD_0639.
Reporting of the SGS bench-scale results is the next milestone, after results reconciliation and technical review. No numerical results from this programme are disclosed here. An optimised flowsheet and commercial recovery have not been established; timing and outcomes are not guaranteed.
Older translated project chapters are retained below as dated context, not as the October update. Updated technical translation is not asserted.
投資仮説 · Minas Americas
拡大する浅部掘削記録、磁石用途に関連する分析元素バスケット、そして鉱山開発の全サイクルにわたる経験を持つ創業者が、2つの主要な技術的マイルストーンを前に一つの投資機会として結び付きます。
最新の技術更新 · 2026年9月8日
投資機会を1画面で
現在の投資機会を形づくる5つの事実と、それを強化し得る節目。
分析済み掘削メートル: 3,628.8 m. オーガー139孔と初のRC7孔、分析済み掘削長1,299 mを追加。
MAV_AD_0375:地表から15 m、TREO 1.15%、MREO 2,830 ppm。
>15 km²の地質図作成済み地質単元内で報告。
永久磁石用の4種のレアアース酸化物を分析値の合計として報告したもので、回収率や販売可能な製品を示すものではありません。
2007年IPO後の基準から2026年6月まで、基本発行済株式数の年率換算増加率は3.9%。この間、旧会社の事業基盤は最大3.0 Mtpaの鉱物肥料設備生産能力を構築したと公表しましたが、これは実際の生産量ではありません。
理由01–04は、日付を明記したMagnesプロジェクトの公表情報を要約しています。 結果と情報源を確認 理由05は、Cristiano Velosoの指揮下におけるAmazon Mining/Verdeの過去の経営実績です。Magnesの資金調達、現金、設備投資、プロジェクト経済性、開発準備状況を示すものではありません。 創業者の実績を確認

材料から用途までの概念図で、中間の処理工程は省略しています。Magnesの工程図や設備写真ではありません。
企業価値を左右し得る節目
2026年末までの鉱物資源量推定と、2027年上半期のPEA。 追加掘削、地質モデリング、代表性のある冶金試験が技術的な基礎データを提供します。
オーガー139孔と初のRC7孔、分析済み掘削長1,299 mを追加。
追加の分析結果は、反復性、形状、連続性に関するエビデンスを強化する可能性があります。
トン数、品位、形状、分類に関する初の正式な推定値。
先行する技術作業に基づく、初の統合的な開発構想。
主要リスク
次の結果に注目
最新の掘削アップデートを読み、Minas Americasを確認するか、今後の発表の配信を申し込んでください。